A pink Charge Fairy van with its charging cable run out to an electric construction machine on a London street

Run electric machines on sites with no power.

Charge Fairy brings mobile chargers to your electric plant, wherever it's working. You don't need a grid connection or any charging equipment on site.

Clients and policy are pushing construction off diesel and onto electric plant.

Electric plant needs charging. Roadworks and job sites often have nowhere to plug in.

We make electric plant possible where it hasn't been viable before. You use electric machines the way you've always used diesel ones, and we make sure they have power.

What happens on site

  1. Your machine works

    Put electric plant on the job and use it like you always have. Your operators don't plan around charging.

  2. We watch the battery

    We read each machine's battery through its manufacturer's telematics, then use live data and past work patterns to predict when it will need energy.

  3. We arrive before it runs out

    We bring a battery-powered charger to the machine and plug it in. Your operators stay on the job.

A pink Charge Fairy van parked beside a yellow Volvo electric mini excavator behind green roadworks barriers

A charger that comes to the machine

Our chargers are battery-powered and travel by electric van, so they need no power from your site. The machine stays where it is.

Read about our mobile chargers
Charge Fairy dashboard listing four machines with their battery levels and current status

Software that knows when to come

It tracks the charge in every machine, plans each visit, and reports usage and emissions across your fleet.

Read about our software

What people are saying

Bringing charge infrastructure to site instead of taking machinery away is a game-changer and if we can do it in London – one of the world’s largest low emission zones – then in theory it can be done anywhere.
FM Conway Matt Tallon
Sustainability Director, FM Conway
Charge Fairy is a perfect example of the kind of innovation we need to accelerate the transition to electric construction. They’re removing one of the biggest barriers to adoption—reliable, convenient power on every job site.
Volvo Construction Equipment Mats Bredbog
Electrification Lead, Volvo Construction Equipment
The health of everybody in London is central to our work, and we are determined to meet our 2030 net zero targets. The trial of electric construction vehicles at Redcliffe Gardens is such a vital part of achieving our goals.
Transport for London Carl Eddleston
Director of Streets & Network Operations, Transport for London

Got a site with no power?